About the Project

Architect: RHWL Architects

Structural Engineer: Arup

Knight Build carried out the temporary works; installation of deep drainage and construction of reinforced concrete floors/ support beams for the penthouse suites.   Knight Build constructed the swimming pool in the basement of the listed building; internal paving; external hard landscaping and the supply and installation of lamp posts and bollards.

Scope of Works:

  • Demolition
  • Façade Retention
  • Temporary Works
  • Basement Construction
  • Structural Steelwork
  • External Works
  • Drainage
  • Frame & Upper Floors