About the Project

Timescale: 18 Months

Architect: Studio Indigo

Structural Engineer: Milk Structures

The existing property contained a set of artist studios which has been derelict for 10+ years. The proposed scheme consisted of transforming the property into a single family dwelling including four levels above ground and two levels of basement below ground.

Scope of Works:

  • CTMP
  • Party Wall Award
  • Demolition
  • Piling
  • Underpinning
  • Excavation
  • Basement Construction
  • Temporary Works
  • Superstructure Refurbishment
  • Roof
  • Structural Waterproofing
  • Design and Installation of Cavity Drainage