About the Project

The project, comprised of two Grade II buildings situated in the South-West corner of Mayfair and involved the extension of the existing lower ground level to include nearly the whole site and the construction of a second basement level beneath the existing basement. The proposals included extensive alterations to the internal layout of the two buildings, installation of a six storey car stacker and full structural waterproofing.

OUTLINE SCOPE | DESIGN & BUILD

  • DEMOLITION
  • TEMPORARY WORKS DESIGN & INSTALLATION
  • ALL SUBSTRUCTURE INCLUDING 3-STAGE UNDERPINNING
  • GROUND SOURCE HEAT PUMP INSTALLATION AND ASSOCIATED PIPEWORK
  • STRUCTURAL WATERPROOFING
  • CAVITY DRAINAGE