Phentermine Order Online Consult
The project, comprised of two Grade II buildings situated in the South-West corner of Mayfair and involved the extension of the existing lower ground level to include nearly the whole site and the construction of a second basement level beneath the existing basement. The proposals included extensive alterations to the internal layout of the two buildings, installation of a six storey car stacker and full structural waterproofing.
OUTLINE SCOPE | DESIGN & BUILD
- DEMOLITION
- TEMPORARY WORKS DESIGN & INSTALLATION
- ALL SUBSTRUCTURE INCLUDING 3-STAGE UNDERPINNING
- GROUND SOURCE HEAT PUMP INSTALLATION AND ASSOCIATED PIPEWORK
- STRUCTURAL WATERPROOFING
- CAVITY DRAINAGE