About the Project

Timescale: 37 Months
Value: £13,000,000+

Architect: Squire & Partners

Structural Engineer: Michael Barclay Partnership

The project involved the demolition of the existing block with a retained listed main façade. This building has five levels of basement below ground constructed in a top down sequence and five levels of reinforced concrete frame above.

Scope of Works:

  • CTMP
  • Party Wall Agreements
  • Demolition
  • Façade Retention
  • Piling
  • Underpinning
  • Structural Steelwork
  • Basement Construction
  • Temporary Works
  • Concrete Frame
  • Upper Floors
  • Design and Installation of Cavity Drainage
  • Structural Waterproofing