About the Project

Timescale: 18 Months
Value: £13,000,000+

Structural Engineer: Robert Bird Group

Knight Build scope of works included substructure and superstructure works to Block N15 which is approximately 35,520 square foot in area. A 10 story reinforced concrete frame structure within the Athletes Village was formed with post tensioned concrete slabs, providing accommodation for hosting the London 2012 Olympic Games. Knight Build also constructed a podium slab providing a car park area beneath and pedestrian area above.

Scope of Works

  • Temporary Works
  • Methane Ventilation Barrier
  • Drainage
  • Groundworks
  • Concrete Frame
  • Post Tension Slab