Structural Engineer: Robert Bird Group
Knight Build scope of works included substructure and superstructure works to Block N15 which is approximately 35,520 square metres in area. A 10 story reinforced concrete frame structure within the Athletes Village was formed with post tensioned concrete slabs, providing accommodation for hosting the London 2012 Olympic Games. Knight Build also constructed a podium slab providing a car park area beneath and pedestrian area above.
Scope of Works
- Temporary Works
- Methane Ventilation Barrier
- Drainage
- Groundworks
- Concrete Frame
- Post Tension Slab