About the Project

Timescale: 9 Months

Architect: Studio Indigo

Structural Engineer: Michael Barclay Partnership

This project included a complete refurbishment to the existing house, with a side extension; also Knight Build provided 3 levels of basement constructed in a top down sequence, which included a swimming pool, gym, spa, and a media room. The project also included extensions on the lower ground floor to the front and back gardens.

Scope of Works

  • Demolition
  • Excavation
  • Piling
  • Temporary Works
  • Basement Construction
  • Structural Works
  • Structural Waterproofing
  • Design and Insulation of Cavity Drainage
  • Construction of a Swimming Pool.