About the Project

Timescale: 15 Months

Architect: Formation

Structural Engineer: Heyne Tillet Steel

The Upper Phillimore Gardens project comprised the refurbishment of a four story semi-detached; single residence town house with the construction of a new basement. The project also saw construction of a new three story detached living accommodation and garage with a linked two levels of basement passageway to the main house.

Scope of Works:

  • CTMP
  • Party Wall Award
  • Demolition
  • Drainage
  • Excavation
  • Structural Works
  • Temporary Works
  • Piling
  • Waterproofing
  • Fa├žade Retention
  • Structural Waterproofing
  • Design and Installation of Cavity Drainage