About the Project

Timescale: 16 Months
Value: £4,100,000+

Architect: Shelton Mindel

Structural Engineer: SKM

The proposed project included selected demolition works, construction of three levels of basement which included structural alterations to the existing house. We undertook installation of roof lighting to the rear, terrace and patio areas.

Scope of Works:

  • Party Wall Award
  • Demolition
  • Basement Construction
  • Piling
  • Underpinning
  • Structural Alterations
  • Drainage
  • Temporary Works
  • Structural Steelwork
  • Structural Waterproofing
  • Design and Installation of Cavity Drainage