About the Project

Timescale: 8 Months
Value: £1,700,000+

Architect: Claridge

Structural Engineer: Heyne Tillet Steel

The previous use of the building was as a public house on the ground floor with storage in the basement and two residential units on the first floor. The Morrison development consisted of demolition of the vacant public house and the erection of a new four story concrete frame, with one level of basement.

Scope of Works:

  • Demolition
  • Underpinning
  • Structural Steelwork
  • Basement Construction
  • Temporary Works
  • Drainage
  • Concrete Frame
  • Structural Waterproofing
  • Design and Installation of Cavity Drainage