About the Project

Timescale: 11 Months
Value: £3,000,000+

Architect: Wolff Architects

Structural Engineer: Form SD

The scheme comprised the reconstruction and extension of the existing building into a four storey house, 2 level basement structure (front and back), with a single storey extension to the rear. Top down construction was implemented on this project as it presented far less risk to neighbouring buildings whilst reducing dust & noise to the surrounding environments.

Scope of Works:

  • CTMP
  • Party Wall Award
  • Demolition/ Alterations
  • Piling
  • Basement Construction
  • Construction of Swimming Pool
  • Frame & Upper Floors
  • Structural Steelwork
  • Roof Works
  • Drainage
  • Structural Waterproofing
  • Design and Installation of Cavity Drainage