About the Project

Timescale: 10 Months
Value: £1,200,000+

Architect: Flanagan Lawrence

Structural Engineer: Michael Barclay Partnership

Knight Build contributed to the redevelopment of this site which included the demolition of the existing building, construction of a 3-storey residential building above with a two level basement extending under the full footprint of the site.

Scope of Works:

  • Demolition
  • Piling
  • Underpinning
  • Structural Steelwork
  • Basement Construction
  • Temporary Works
  • Drainage