About the Project

Timescale: 14 Months

Architect: Studio Indigo

Structural Engineer: Milk Structures

The project consisted of alterations to the existing family property including excavation of a double level basement under the front and rear gardens, the project also included an extension to the lower ground floor. The rear closet wing was extended on the second floor, and a loft conversion with rear dormer windows.

Scope of Works:

  • CTMP
  • Party Wall Award
  • Demolition
  • Excavation
  • Underpinning
  • Piling
  • Basement Construction
  • Structural Works
  • Structural Waterproofing
  • Design and Installation of Cavity Drainage