About the Project

Timescale: 18 Months
Value: £4,500,000+

Architect: Amin Taha

Structural Engineer: Whitbybird

This project included the construction of a five storey basement from the existing ground floor level with the construction of a seven storey concrete frame above including the design and installation of all temporary works.

Scope of Works:

  • Basement Construction
  • Piling
  • Concrete Frame
  • Temporary Works
  • Drainage
  • Structural Waterproofing