About the Project

Timescale: 14 Months
Value: £1,000,000+

Architect: Lifschutz Davidson Sandilands

Structural Engineer: Trigram

Knight Build took possession of the site designing and installing all temporary propping. The first phase of the project involved the complete refurbishment of the building and construction of a two level basement under the full sites footprint of 186 square meters.

Scope of Works:

  • CTMP
  • Party Wall Agreements
  • Demolition
  • Excavation
  • Underpinning
  • Sheet Piling
  • Temporary Works
  • Structural Works
  • Façade Retention
  • Roof Works
  • Structural Waterproofing
  • Design and Installation of Cavity Drain