About the Project

Timescale: 12 Months

Architect: Studio Indigo

Structural Engineer: Michael Barclay Partnership

Albert Place project proposed a complete internal & external refurbishment, a side extension to the front fa├žade and a new roof. The project also included the construction of 2 levels of basement & a car lift.

Scope of Works:

  • CTMP
  • Party Wall Award
  • Demolition
  • Excavation
  • Piling
  • Underpinning
  • Basement Construction
  • Enabling Works
  • Structural Alterations
  • Drainage
  • Structural Waterproofing
  • Design and Installation of Cavity Drainage